Over the long holiday weekend I only managed to sneak in roughly a day and a half of work on the shop. Between Friday afternoon and Saturday I secured the base cabinets, assembled the “floating” top for the DeWalt 706 miter saw, and built the three countertops. Not too bad considering the time.
Facebook Comments